What is risk analysis and what kind of risk you foud while
testing
Answers were Sorted based on User's Feedback
Answer / satyaprasad
Risk analysis comes under the phase of testplan
Ex:lack of domain knowledge,lack of time ,testing
teamsize,lack of resources....etc.,
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bondu
risk analysis is process of identifying ,analysis and control of risk .
what type of risk we found in testing
1)product risk
2)project risk
| Is This Answer Correct ? | 0 Yes | 0 No |
Is v-model cost effective when compared with all other models? If not which model is cost effective(low cost)?
WHAT IS JOIN AND TYPES?WHAT ARE STORED PROCEDURES?
How many Test Cases do we need to write for a particular application?(For example, for this AllInterview.com?)
what is the diff between ad hoc and exploratory testing ?
What is risk analysis and what kind of risk you foud while testing
what is the format of traceability matrix u prepared in ur company?
What type of testing skills we required for a testing.
How can you test an application after production and deployed in to the clients system by connecting to the (Client's)server which is located somewhere in the US. I mean how can you connect and test when it is at maintenance
1)What are the QA procedures followed 2) Write test cases on a weatherreport.com web page that has only two dropdown and a submit button, Fist drop down is a countries and second is metros in the selcted countries.When proper selection si doen and submitted it shows weather report of that metro.? 3)Write test cases on Mobile Alarm Module? 4)Write test cases on Company Water Bottle?
what is major challenges in Real time system testing? Explain the way of Testing for Real-Time Systems.
What is Test Coverage?
pls tell me who is in s/w testing field(either in company or as faculty) give the ans of my que. tel me why r u in testing ? reply me as soon as possible