Who will perform Integration Testing?
Answers were Sorted based on User's Feedback
Answer / naresh
Test Engineers perform Integration Testing in development phase
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shyam
Yes,Narendra is correct.White box tester and Developer is
perform Integration testing.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / kk
test engineer will perform integration testing.
after individual modules are integrated woth one another we
will give some data in module and we will verify the out put
in the corresponding module. data flow and navigation should
be as expected. individually tested modules may or may not
work properly. thats why we do integration testing.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / wandana
Integration testing will be done by both Developers and
testers.both must go for continutity.
| Is This Answer Correct ? | 1 Yes | 3 No |
Answer / ram
Hi
Integration Test Performed by senier Testers
by writing Scenarios
sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 1 Yes | 4 No |
Hi, dis is Deepa, I completed my Administration Degree, worked as an admin then got promoted and currenting working as an Trainee - Quality Assurance.... I'm not so familiar that job... I would like to do course for Manual testing or Quality Assurance.... Where can i do the course as "the best" Kindly refer me any training centre for this with 100% placement assistance....
How to Test Web Application Without a Formal Test Plan....?
Big Bang Model isn't preferable for higher cost project? a. True b. False (Need the answer urgently) Thanks!
EXplain the diffeenet types of bugs.....
14 Answers GE, TCS, Vertex,
can som1 can tell me that can two or more tester can be given the same project for testing such as unit, regression,UIT,retesting. suppose the project has 10 modules so can all the tester will be asine to write the test cases for same or for differt modules? and in one project how many testers of the same level can participate? plz answer it fast. txs in advance and in which phase we will do the retesting in stlc
How can a testengineer coordinate with developer in fixing bugs?
What kind of document u need for going for an functional testing?
Can you explain Co-habiting software?
WHAT IS THE MEANING OF CCC IN TESTING TERMINALOGY
Do you know of metrics that help you estimate the size of the testing effort?
Hi,all i have a desktop App. which have a feature, It's a demo version if u want full version then u have to perches it. Pls give me some idea ASAP how can i break the App.
wt is the diff. bet. verification and validation If possible explain with one example.