what are the Nine mandatory Flexi fields in Inventory set up
Answers were Sorted based on User's Feedback
Answer / indu
Define Items Flexfield
Define Item Categories Flexfield,
Define Item Catalog Group Flexfields
Define Stock Locators Flexfield
Define Account Aliases Flexfield
Define Sales Orders Flexfield
I don't think there are nine but above mentioned are the
required flexi -fields in Inv
| Is This Answer Correct ? | 17 Yes | 1 No |
Answer / babu
hi, indu, i also think there are only six flexfields as you
mentioned.
All of these flexfields are of multi-segment. and only
Item Categories Flexfield is multi-structured.
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / harish kumar sharma
Hi Oracle Professors,
For sure, there are only 6 mandatory flexfields till R12.
Regards,
Harish
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / uttam de
Hi All,
There are only 7 Key-flex are mandatory in R12 Oracle EBS
1. Acount alias
2. System Item
3. Item Categories
4. Item Catalogs
5. Sales Order
6. Stock locator
7. Service item
Thanks
Uttam
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / kishore
7 Key Flex fields are present in R12 Inventory module.
1. Acount alias
2. System Item
3. Item Categories
4. Item Catalogs
5. Sales Order
6. Stock locator
7. Service item
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sairam
hello oracle professionals
ya u ppl r right there r only 6 mandatory flexifields till
r12.
| Is This Answer Correct ? | 1 Yes | 1 No |
How Many Inventory Org can be/are there
What are the Required Setups need to be done in Inventory?
Explain the OSP cycle?
What is an Organization Assignment?
What are the basic modules of Oracle Apps? Which are very popular
24 Answers Accenture, iGate, TCS, Textiles, Wipro,
What is yield point?
What is difference between Sub inventory Transfer and Move order Transfer?
Cycle Count?
What is accouting class and where is it defined iN WIP?
In osp cycyle i have one finished goods -FG1 Raw material - RM1 Osp Item - OSP1 Resource -Ospres01 Charge Type -PO Move I assign dept, then i created routing and bom. then i realsed job the PO requestion Generated But when i replace on another OSP ITEM - OSP2 for OSP1 having same attributes i am not getting Po requestion CAn any one help me? Thanks in advance, Raghunandana raghu.nandana@rediffmail.com
What setups are done in WIP?
What is Reorder point and Reorder quantity? and what is its significance?