Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the trip circuit supervision in an electrical meaning?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Power Plant Engineering Interview Questions

What is difference between secondary Air & Tertiary Air and Their use.?

0 Answers   Bhel,


Boiler capacity is 5ton, what will be the feed water tank capacity?

11 Answers   dscl, Indiabulls, Krest, TCS,


In a thermal power plant ID Fans running with full load but boiler load is only 80 % give reason ?

9 Answers   Essar, Prumatech, Tata Power,


What is LB-SR.

0 Answers  


What is MFT and when it is acted.

2 Answers   HPCL,


what is the formula for converting mmwc to tph in a dp type transmitter.what is the range in plc(in tph) if dp tx.range from 0 to 5000mmwc.

2 Answers   CCC, Korba Power Plant, Shyam Steel, Utkal Alumina International,


By any way can we increase the B check hours from 300 to 500

0 Answers  


if suppose boiler has high heavy tube leakage, so in which time we feed the water in a boiler. can we stop the feed water at particular combustion temperature.

4 Answers  


why high pressure heater will take after sufficient pressure? what happen when high pressure heater will take from COLD REHEAT line at light up time when hp and lp by pass in service.(means can we heater take at low pressure?)

2 Answers  


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

0 Answers  


whatis means of PPA & FSA OR SFA in power plant operation

2 Answers  


what are the major duties of a instrumentation engineer in a power plant.?

3 Answers   Gulf,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)