Iam searching for a job in manual testing(2.9yrs exp) i
faced no.of interviews they r asking me to tell me about ur
project iwant to know, for any type of the project what are
the steps,contents we have to tell about. so pls send the
detailed description of copies to my email id.
Answers were Sorted based on User's Feedback
Answer / rekha rajora
Sorry Sahu.I think u didnt understand the Question.
What I feel is that she wanted to know about what to tell
if somebody ask about your project on which u are working
or worked.
In My opinion Whenever you go for an interview make sure
that you Should know the detail of the functioning of the
project.
When the interviewer ask about your project tell him the
following:-
1. Current project on which you are working.
2. Main funtionality of the project.
3. Number of tables(tbl) in the project.
4. Your responsibity (which is mandatory)
Make me correct if I m wrong.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ch.s.m.prasad,kkd
u r answer exactly correct Rekha.............
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / saru
Firstly be careful in showing 2.9 yrs of
experience.Interviewers think you know many things. and if
you have 2.9 yrs of experience means, the start of project
testers are involved. they are provided training on the
product along with the developers,etc. then the Test
Manager or lead writes the test plan. then as per the
responsibilities defined in the test plan, a test engineer
starts writting the test cases. Once the code is ready, a
build is sent to the testing team in .exe form and testers
start testing the application. then test results are
generated and for each test case bugs are reported, then
test result is reported and then a test report is generated
after the completion of testing. this test report is
generated by the Manager or Lead.
| Is This Answer Correct ? | 0 Yes | 1 No |
Presently working in software company as a software test engineer with 1.5 yrs of experience but i am 2002 passout.Gap is 6 yrs.Is there any problem getting job in MNC? Which criteria HR follows for recruiting test engineer?
In front end if you enter one record it will be inserted in to 20 tables in back end.so How you are going to test in Manually whether data is going properly in to concern data tables or not? Is there any better solution to do that instead of opening the table and checking individually?
i got a bug in gmail the bug was i had saved some data in draft and i forwarded the data to my friend and the data was not present in draft it had move to sent items.what is the sta tus of the bug
What would be your action if client would raise a bug after release?
What are the issues that u observed in the kick-off meeting?
how can client know that the bug which has been corrected
Difference between verification and validation?
what is soak testing
Could anyone explain the testing process end to end? I you get a new project what you do, first as a test manager? Explain later steps too...
What is severity and Priority,gave me a example of High Severity and Low Priority and Vice Versa.
Anyone attended the manual testing interview with L&T infotech in recent past. please let me know the type of questions they can ask especially in PM round. Thanks
1.What is the risk factor problem related to project?