When bug is raised ?
Answers were Sorted based on User's Feedback
Answer / tamilkumar
Bug was raised when "Actual results and expected results
doesnt match"
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / sidharam karande
bug's are raised during the execution of test case if we
find the variation in the expected result and actual result ,
hope this is correct ..if any pls share
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / guest
Bugs is raised at all the levels of testing in the SDLC.
When there is any deviation from the intended functionality
in the application, there arises a need to raise a bug.
| Is This Answer Correct ? | 1 Yes | 3 No |
What is Test Strategy and Test Plan..what is the Diff.between those?
What is difference between Bug resolution meeting & Bug Review Committee? Who are participants?
what are entry criteria(other than SRS) and exit criteria( other than Traceability matrix) in Test plan preparation
In a Dark Room one Switch Board is there.If u Pressed a Button in Switch Board the Light will 'ON'. Write the Possible test cases?
can anybody tell me what is thread testing with a practical example,coz the defn is liitle complex it seems.
Who will assign the work to Test Engineer?
write test condition for testing SMS service of a mobile phone maximun length is 100 character while sending and 80 character for receiving write test scenarios do not write test cases
what is means by feature to be tested in test plan
WHAt is diff between test plan and test planning?
What type bugs you will find in integration testing with example?
what is bugzilla? and how it is used?
What is Manual and Automation Testing Framework