Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
No Answer is Posted For this Question
Be the First to Post Answer
WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?
FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38
who to calculate the bar bending schedule?
How to calculate soil bearing capacity of soil?
What is mean by uniaxial bending
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick. How much Bag of Cement (50 Kg) and Sand (Cum)
What will be weight of 0.5mm GI sheet per sq.ft?
What is the DENSITY of 20mm Course aggregate?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What is critical path method (c.p.m)?
how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum.
7 Answers Opera, Raheja, Star,
What is the pet difference between bent up bar and cranked bar ?
1 Answers Foundation Stone, GHH,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)