Who assign Bug Id & Bug Version Id?
Answers were Sorted based on User's Feedback
Answer / neha nalin raina
Bug Id is unique identifier given to a bug,its while
generating test case.
and bug version id is the version of product you are testing
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / subhashini
Bug ID and Bug Version ID are entirely different. As u
said, Bug ID will generate Automatically by the Bug
Tracking Tool. When the Tester is reporting a Bug, he need
to mention that it was reproducing in which Version. It is
nothing but the Bug Vesion ID. For Eg : Bug Id 2021 is
reproducing in Version 1.1.9_12082008.(i.e Version 1.1.9
dated 12th August,20008).
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / bishwajit rk
Bug ID is assigned by the Defect tracking tool which u r
using.
About Bug Version Id, I don't what it means. Sry.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / devendra
Bug id & bug version id is same.when u found the bug then u
fixed a bugid of that bug.when bug is fixed then applicatin
is moved in new version .if u found new bug then u assign
bugid version.this is a fixed number.
Is This Answer Correct ? | 0 Yes | 2 No |
what is test data?how test data is prepared? are there any guidelines/methods to prepare it?
Hi, my name is Maiko and I work as a Business Analyst. Does anybody have experience with TOSCA Testsuite? I hear it's all new and great but I can't really find any user reviews. Please help me out. thx
What is Ur Streght?(In P.M)
12 Answers L&T, MBT,
Can anyone tell me what should be the test cases for Security Testing?
In first version of the build i found a bug . I report it to my developers with all the procedures and that was accepted by the developers and the bug was in open state. In the next version of the build the bug was not able to reporduce it .Then wat will be the status of that bug
how will u Do Smoke testing and Sanity testing for these fields:We have 3 fields on page: Name,Address and Pincode ?
are you ready to work on new domain but you dont have any body to take help or suggestion (seniors).you are the initiator?how will you work in such cases?
In real time where u can apply traceability matrix
there are many test cases in our test case repository like function,integration,system,acceptance test case so which test case should test engineer test first.? please answer me . thanks
Adobe puzzles: . . . . . . . . . connect all these dots using 4 continuous lines.one clue u can extend the line after the points also. 2.one basket contains apples,second basket contains oranges and third basket contains apples and oranges the labels are wrongly mentioned.pick one fruit from one of these basket and find which basket contain which fruits.
What is the difference between functional requirement and non-functional requirement?
what is testing policy and testing methodology? and what is the difference?