How much is the curing time period?

Answer Posted / saquib hassan

To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

1769


Whats the meanig of ,'K' VALUE in the case of soil.....

1518


i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard

1994


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1492


Design a rectangular channel.

2575






i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1967


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1685


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1328


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1704


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1486


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1787


procedure for preliminary selection of size of column of 5 storey building

2679


how to calculate testing date

1332


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1754


What are the advantages of cad?

726