Answer Posted / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
where i can get material costs on weekly basis
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
why we use 19x9x9and 20x10x10 but not other
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How to calculate brick work quantity?? Block work quantity??
how calculate the bearing from two coordinates?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What is the difference between shear and tensile strength?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
For what purpose bedding is used under storm water drains?
What do you mean by honeycomb in concrete?
What applicable rate of wct in bihar
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what is pile and deam foundation