I am in India. Employer A got approval for my H1. But they
have no job for me now.
Company B is going to file H1 for me. They do not know
about company A.
Is there any way that I get approved H1 of company A
transferred to Company B?
No Answer is Posted For this Question
Be the First to Post Answer
Why we add salt in silt content test of sand? Full reason ?
What is the thumb rule for calculating the number of chairs in slab?
Minimum sizes of beam and coloumn
How to calculate the quantity of ingredients of M20 grade concrete?
Where hinge support is used in residential building?
what is civil engineering?
2 Answers CPWD, drda, Jal Nigam, NHPC, Uttar Pradesh Jal Nigam,
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
how to calculate load bearing column
what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
0 Answers Pratibha Industries,
what is the diffrence of opc and ppc cement ? expailn
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
why do we not deduct volume of steel to find actual volume of concrete in practical???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)