I am in India. Employer A got approval for my H1. But they
have no job for me now.
Company B is going to file H1 for me. They do not know
about company A.
Is there any way that I get approved H1 of company A
transferred to Company B?
No Answer is Posted For this Question
Be the First to Post Answer
how much dry volume of cement in 1cum in m20 grade
How you can use different dimension tools in cad? What are the different dimensions available?
What is Time period of a building and its relation with frequency ?
What do you mean by TOLERANCE in steel
what is the unit for sbc of soil
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
what do you mean by fe500d what is 500 n what's ,d,
What in bending moment, if a moment is free end of cantilever beam?
1sqm=? wood
2 Answers Ackruti, Nagarjuna Construction, SRS Group,
How does a traffic light signal work ?
What is '43' in OPC43 cement? What is '35' in M35 grade of concrete? Is there any link between them ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)