apart from bug reporting wat is ur involvement in project
life cycle
Answers were Sorted based on User's Feedback
Answer / aman
Apart from bug reporting Test Engineer's involvement in
projectlife cycle are:
1.design test cases
2.prepare testcases
3.Execute Testcases
4.track the bugs
5.Analysis the results report the bugs
6.Invovled in regression testing
7.Performance of system testing
8.system intergration testing
9.preparation of Test summary Report
10.Involve in Quality sigh off for UAT
11.Training the business user on the new configuration
12.Taking their(users)feedback back to the developer.
Aman Kumar
aman.testing@gmail.com
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / dave
in addition to the above mentioned,preparation of
traceability matrix too...
| Is This Answer Correct ? | 3 Yes | 0 No |
As a Test engineer We design test cases,prepare testcases
Execute Testcases, track the bugs, analyse the results
report the bugs.
invovled in regression testing, performance of system
testing system intergration testing
At last preparation of Test summary Report
| Is This Answer Correct ? | 2 Yes | 1 No |
What would be your action if client would raise a bug after release?
In a Software testing Field, What you think a TESTER needs...?
can any one tell me what is the difference between Integration testing and End-End testing? plz dont tell me Integration is whitebox testing and done by developers, where as End-End is blockbox testing and done by testers.
What are new features in Vista / Longhorn ?
2 Answers nvidia, Symantec, Veritas,
What is the difference between the company site and the yahoo site?
What is the outcome of integration testing?
what is the difference between test case and testscenario,plz answer for this
What are Testing Metrics? Explain
is Business requirment doc is configurations item or not how you control configurations control
who provides the test data in ur company?
What is the difference between User Acceptance Testinga and System Testing?
What is the initial stage of testing?