apart from bug reporting wat is ur involvement in project
life cycle
Answers were Sorted based on User's Feedback
Answer / aman
Apart from bug reporting Test Engineer's involvement in
projectlife cycle are:
1.design test cases
2.prepare testcases
3.Execute Testcases
4.track the bugs
5.Analysis the results report the bugs
6.Invovled in regression testing
7.Performance of system testing
8.system intergration testing
9.preparation of Test summary Report
10.Involve in Quality sigh off for UAT
11.Training the business user on the new configuration
12.Taking their(users)feedback back to the developer.
Aman Kumar
aman.testing@gmail.com
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / dave
in addition to the above mentioned,preparation of
traceability matrix too...
| Is This Answer Correct ? | 3 Yes | 0 No |
As a Test engineer We design test cases,prepare testcases
Execute Testcases, track the bugs, analyse the results
report the bugs.
invovled in regression testing, performance of system
testing system intergration testing
At last preparation of Test summary Report
| Is This Answer Correct ? | 2 Yes | 1 No |
what is difference between black box and white box testing? In most of the companies which tecnique is used
What all document are required to testing?
what is STUB & DRIVERS ?
1)What is the main difference between web based application and windows based application ? 2)can anyone give me proper example of high severity and low priority ,low severity and high priority , both are high and both are low ?
What might be the reasons for changing the status of a bug to " NOT A BUG " ?
which phase is most important in STLC phases? and why ?
How load testing is different from regression testing?
is test data the same as test condition
what is v-model?
What's the relationship between environment reality and test phases?
how to test stored procedures in manually?
For 1 Year of experience in manual testing and business analyst what will be the roles and responsibility???