what is meant by shear center?????
No Answer is Posted For this Question
Be the First to Post Answer
how to draw road profile
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
what is the difference between linear and curved elements?
How many bricks are there in 100cft?
Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.
Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
Define current ucs?
how to caluclate sienerge qty in construction in ap
what will be hook length of stirrups
What is the difference between single reinforcement
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?