What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building)
area of RCC?
Answer Posted / kailaspaithane
It totally depend on design and load basis
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what pressure the NP2 class RCC pipe can sustain?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
how to estimate material requirement for an area of house in square feet?
afe or not
how to calculate the weight of concrete
What is a bearing capacity of soil?
any book or article on pumped concrete.
Which tests are performed on soil to decide the type of foundation to be provided.
What are the reasons for geotechnical site investigations in uganda?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
In which code the the maximum height of concrete casting has been explained
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what is moment-curvature relationship in semi rigid connections??
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
How can i do RCC rate analysis?