hai,
kindly send anyone for output workers format details for construction project in foundation to finishing.
No Answer is Posted For this Question
Be the First to Post Answer
what are the compressive strength requirements(in 7 days & 28 days) of cement sand mix used for plastering purpose (Cement:sand-1:6)? Kindly give the IS Code reference also.
1 liter emulsion paint covered how much area?
17 Answers Asian Alliance Insurance, Aspirtek, DEWA, L&T,
what is the real de-shuttering time for rcc column,slaband wall
How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
How many fly ash bricks can occupy in one cubic metre ??
How many no of bricks in 4.5 inch wall per m3 If brick size is 9"x4"x2 3/4"?? Please
2 Answers AR Rahman Foundation,
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
What is meant by struct column And stub column
3 Answers L&T, Shoba Devlopers, TATA,
what are the minimum compressive strength required for the concrete cube for different grades & different days .Please give me an answer.
Is it possible to make a feature using an overdefined sketch?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What is the thumb rule for calculating the number of chairs in slab?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)