What is the percentage of wastage in cement n how to control it?
Answers were Sorted based on User's Feedback
Answer / mohsin
Considering wastage In Cement 02% Of Total Quantity.
| Is This Answer Correct ? | 0 Yes | 1 No |
waht is the range of compacting factor test result for good concreate?
What is meant by autocad?
why we designed limit state method?
if water absorption is more than 25 percent in brick, what is the defect in it?
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
how to find the diameter of steel bar from steel area
Advantages and Disadvantages of using fly ash bricks over clay bricks?
11 Answers Pradhi Engineering,
Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?
How can I make justification between using concrete grade c35 compare c37?
what is the yield strength of M30 grade of concrete
How to get cinema chance?
How many bricks in one cubic meter? Birck size 22.9*11.4*7.6 joint 12mm Give me answer with calculations
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)