Answer / mohsin
Considering wastage In Cement 02% Of Total Quantity.
Is This Answer Correct ? | 0 Yes | 1 No |
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
how calculate the ms beam weight?Please give me formula details?
Typical floor design load in Residential Building----------- -----
1:4:6 grade 15.84cum and how much cement and sand aggricate are used
1 Answers Minartech Developers,
Whta is the proportion of M30
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
What is the ratio of cement, sand, aggregate of mix M25
20 Answers CCCL, Sarvottam Cement,
hai.... please any guide me were i can get interview questions& ans for Unigraphics
Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
How do you compute the volume of airflow?