Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
No Answer is Posted For this Question
Be the First to Post Answer
What is the lapping length for 32mm steel rod as per BS standards?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Rust in Rod is harmful in structure because -––
though u r a civil engineer, y r u interested in tcs???
0 Answers TCS, URC Construction,
what is the purpose of laying PCC?
what is total volume of ingredients used in concrete accordingly
what is the difference between arch dam and gravity dam. Name a gravity dam in India
6 Answers AAI Airports Authority Of India, L&T,
what is bond strength .
What is bending moment?
what is the difference between factor of safety and partial safety factor.??
slump test report
Fly ash is residue generate from??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)