productivity of steel fitter per day
Answers were Sorted based on User's Feedback
Answer / syed shah
It is depend on the country wheather condition, person and dia of steel
| Is This Answer Correct ? | 1 Yes | 1 No |
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
In a slab where does the Uniformly Distributed Load (UDL) act?
what is the minimum and maximum thickness of plaster.?
what is period of de-shuttering for different area of slab of M25 grade?
how you confirm the hard stratum for driven cat in situ pile work?
# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
how inovative you are?...how do u define innovation?
What is PCO
what is quantity of sand required to plaster wall about 1000 sq ft
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)