Prepare a Schedule for a Highrised building from starting stage to Handover?
No Answer is Posted For this Question
Be the First to Post Answer
Rigid pavement Load in tyre preesure It Means KG
state and explain in Water absorption of brick
What are types of mixs ?
how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
1 Answers LiveCon, Sobha Developers,
What is modular elasticity?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
what is meant by MIS report
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
How we calculate the service time of buildings
What are some structures that are subjected to fatigue?
what are the types of trusses
define formwork