Prepare a Schedule for a Highrised building from starting stage to Handover?
No Answer is Posted For this Question
Be the First to Post Answer
In cement concrete pavements why cracks are develop aolng with logitudinal&tangenteal directions
i want to know the easy way to find the quantity of steel in a slab , coloumn
while doing floring in a room,from where one can start laying tiles.
why are you joining in this (applied post) job and your aim for this job
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Difference b/w tor steel or tmt bar
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Cube tests of concrete are failed at 7 days and 28 days.What is your next action?
how to consider the laping length of steel?
Explain what is the difference between built area and super built up area?
how to calculate MR 9(derivation)
the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)