Prepare a Schedule for a Highrised building from starting stage to Handover?
No Answer is Posted For this Question
Be the First to Post Answer
what is tensile strength of {6,8,10,12,16,20}mm dia bar? also there were any formula?
what cement consumction plaster 15mm think per sqmt 1:3&1:6 how much kg.
please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
what is quick sand
what is chicken mesh?explain its use
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
how to calculate the density for high density concrete ? or is it same as the density of RC?
what is meant by hidden beam & purpose of hidden beam
2 Answers Carwell Construction, NTDC,
In the cement the compound quickest to react with water
how to find steel quantity
how many materirials in 1 m3 concrete
why bent up bars in slab provided in alternate manner and not continuos ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)