do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
No Answer is Posted For this Question
Be the First to Post Answer
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
rate analysis of shuttering
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
how to calculate quantity of cement and sand for plastering works in CM 1:6 proportion.....plz answer anyone.....and write the formula...
what is mix design of sand cement and and aggrigate of M10 M20 M25..
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,
Outline ten different ways in which typical bill of quantities can be used?
what affect on the structure and related beam of slab when provide one way slab insteade of two way slab
if dia of capillary tube is doubled the capillary rise will unaffected doubled halved none
How Many Cement Bags Are Used in 1 Sqm Area for Plaster????
8 Answers Era Infra Engineering, FactSet Systems, Indu Projects, L&T, Reliance, Rites,
what post do you prefer to work in this company and why do you think you can serve better in such position?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)