Dear all,recently in our plant we installed a conveyor for this the motor ratings are 5 hp and Amps 7.39.Due to on urgent starting of conveyor we fix the DOL starter with range of 9-15 amps.give me suggestion regarding on this issue



Dear all,recently in our plant we installed a conveyor for this the motor ratings are 5 hp and Amps..

Answer / sandip

Use VFD and connect output choke if cable length is greater than 50 meter

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the transformer

6 Answers  


What is communication? What are the different stagesin the communication process?

1 Answers  


what is the function of Moulded case circuit breaker, why it is called Moulded?

0 Answers  


what is the advantage of using 3 phase line rather than using 2 phase line?

2 Answers   Havells,


what is meant by power and distribution transformer ?

0 Answers   CG,






What is a soft start?

4 Answers  


If a contactor need to replace with faulty one. what I want to check?

2 Answers   Bhel,


I have 2 transformers in two different plants, both are without OLTC but i am facing problem of voltage fluctuation at LV side from only one transformer. i have to change its taps manually twice in a day. Another transformer delivering voltage is ok. Please guide me about the problem

1 Answers  


Difference between hopkinson and swinburne's test

1 Answers  


how will u exactly calculate the unit consumption of the Air conditioners?Split/Window/

3 Answers  


Should transformer earthing pit, to be connect to earthing mat in Substation

4 Answers  


what is mean by harmonics

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)