what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
Difference between the setting time and hardenin time of concrete
What are the advantages and disadvantages of lead products in construction?
what is the unit weight of steel(kg/cum)& unit weight of concrete in(kg/cum)?
How do you measure water flowing through 300mm diameter pipes?
# 1. size of the Bricks # 2. Minimum Crushing Strength of Bricks
Please give me the mixing ratio for higher grades of concrete (M30, M35, M40, M45, M50) using cement, VSI sand (Maharashtra) and metal. In case any other additives are supposed to be added to my concrete please let me know about that as well.
Give me the name of type of slabs?
Why provides hook of stirrups only ones side?
The mixture of different ingredients of cement is burnt at?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
what is difference between bending and twisting
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)