Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
Answer Posted / arbaz shaikh
16922sq ft=basement,
32022sq ft=super structure rehab
69087sq ft= for sale structure
Scope of work-rcc work,brick(siporex)block work,plaster.
Concrete(m-25 to m-50) -1.25cft.Sqft of bua,(for super structure.
4cft sqft of bua (for basement)
Consumption of steel(fe 550d) -5.5 kg sqft of bua for super structure.
12 kg sqft of bua for basement
What should quotation for this please guyz help me out .?
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
how much cement sand n bricks required in im3?and how much in plaster?
how to convert sand in Cft to Kgs
What is modular elasticity?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Explain the difference between shear and tensile strength.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
pls tell me about method of cutting length of ties column
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
how to workable concrete cube test M-25 design mix
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
crank types
Explain the different types of roofing systems?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.