Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
| Is This Answer Correct ? | 0 Yes | 0 No |
1 bundle=how many rods s there? and what is the length of each rod
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
internal dia of sewer pipe should not be less than A] 15 cm B ] 20 cm C ] 25 cm
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
difference between deep and shallow well?
what is quick sand
what is a pretension and post tension with an example
Structural steel: For a thumb rule check in field, the allowable weight which can be hung down for 10mm dia mild steel rod, of yield value of 0, 25 KN/mm2 and applying a factor of safety 2.00, will be how many kg?
Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.
can any one tell me how to estimate the reforcement of circular slab and also for dome.
What is the formulae of percentage of steel
how many cement in cubic feet of 40 kg bag white cement.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)