Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
| Is This Answer Correct ? | 0 Yes | 0 No |
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Formula for calculation volume of essentric footing
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is meant by a context menu in a cad software?
what is high type road and low type roads
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
How to find the cuplock pipe qty in staging for Minor bridge?
What is the roll of face bars in beams
specific gravity of block cotten soil, normal, rockysteta
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)