Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer Posted / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the specific gravity of rubble in plum concert
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
Minimum and maximum size of the building components
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Which percentage of carpet area use in plot area of office building.
difference between trapezoidal and pedestal footing and how the load acts on that
what motivates you to do a good job
Sir how to find cutting length for footing steel bars in the shape of "u"
What is meaning of FREE STANDING STAIRCASE ?
water leak detection system question & answer