How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
No Answer is Posted For this Question
Be the First to Post Answer
sir how can we find the cement and sand required for making 4" drop
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
how many bags of cement required in neat cement finish per square metre
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
how to calculate quantity of steel in a slab , coloumn and beam
1 Answers JSW, Om Sai Builders,
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
how many types of survey and what are levelling instrument?
what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?
1sqm=? wood
2 Answers Ackruti, Nagarjuna Construction, SRS Group,
how statics is different from dynamics
How can we demolish concrete beams?
What is meant by cad?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)