Rate analysis of Vitrified tile in cement mortor 1:3
No Answer is Posted For this Question
Be the First to Post Answer
what is SDLC ?and write a 'c'program for to swapping the three numbers?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the purpose of Chipping in the heavy foundation?
why demand factor less then 1 ?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what is the meaning for 'prime cost' in civil construction contracts?
3 Answers EPPPL, Nagarjuna Construction,
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
what is the weight of concrete for 1 cum?
Why silt content not allowed more than 6% for Sand ?
What is mean by grade of steel?if Fe 415,Fe500- what is this 500 and 415 denotes?
what is the comprasive stranth of brick
What is the design mix? What is the proportion for M25, M35, M40 concrete mix.
9 Answers ACC, DBM, Era Infra Engineering, Thakural Constructions,