Answer / sanjay prajapati
For a high rise building of 11 to 12 Floors, @ 3.0 kg is steel consumption per sq.ft and upto 0.3 bag of cement per sq.ft.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / aneesh mohan
Steel Consumption = 100 Kg/m2
i.e, = 100/10.765 = 9.30 Kg/Sqft
Concrete = 5*2*0.1= 1 m3
i.e, for 1 m2 = 1/10 = 0.1 m3
1 Sqft = 0.1*10.765 = 1.07 m3
| Is This Answer Correct ? | 0 Yes | 4 No |
How can you achieve soil enforcement?
how to determine H- zone in a column? where it will occur?
Allowable wastage for ready mix concrete?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is Refuse Area In High Rise Building ?
9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer
what is called super elevation of the road?
what is a louer? and for which purpose it will be used.
in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity
Which is stronger solid steel rod or hollow steel pipe?
What is the use of offset command?
15mm thick plastering 1:4 what is the cement consumption per sqm
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)