anyone can tell me the consumption of steel and concrete per sqft.?
Answer Posted / aneesh mohan
Steel Consumption = 100 Kg/m2
i.e, = 100/10.765 = 9.30 Kg/Sqft
Concrete = 5*2*0.1= 1 m3
i.e, for 1 m2 = 1/10 = 0.1 m3
1 Sqft = 0.1*10.765 = 1.07 m3
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Where will be the maximum bending moment in a TEE Beam?
what pressure the NP2 class RCC pipe can sustain?
Define What does civil status mean?
What is difference between limit state and working stress method? How it is applies in building structure.
What is chemical composion test
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how pumping of concrete effects the quantity of material used in it?
What is the use of extruded feature in solidsworks?
What is gravity flow?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what would be the design load of R.C.C Cooling tower per cell.?
if the nitrates more than 45mg/l in water lead to disease then what is it called
what is the water cement ratio for plastering