Answer / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
| Is This Answer Correct ? | 0 Yes | 0 No |
# 1. Water observation capacity (MAximum)of Solid bricks # 2. Minimum Crushing Strength of Solid Blocks.
What is the finess modulus of sand?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
Questions related to civil.engg in company
In a slab where does the Uniformly Distributed Load (UDL) act?
Why is loose concrete removed from the surface where new concrete is to be done?
convert 1cum how many kilo
in 100 cft = 1350 bricks in 100 cft = ? bloks
what should be the minimum cross sectional dimensions of column for any given loads????
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Differentiate orthographic and isometric projections?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)