How to layout the site plot ? Method with explation
Answer / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the depth of a pile foundation??density of wood?? nominal mix ratios for different grades of concrete? effect of earthquake on structures? bending moment and shear force diagrams and also learn to find out the deflection..how is under water concreting done??
Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.
How much time Required for PPR pipe network testing
If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D lap length which dia.should I consider for lapping
rate analysis of shuttering
what type of cement are used for fixing of tiles at floor/wall
Under what circumstances should pot bearings be used instead of elastomeric bearings?
what post do you prefer to work in this company and why do you think you can serve better in such position?
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
What is OSHA compliance?
how to calculate unit weight cement ,water ,steel
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)