How to layout the site plot ? Method with explation
Answer Posted / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In earth work 1300 cum soil how to calculate how many liters require in water
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
can stub column take the load as main column
How to calculate carrying capacity of the existing water supply trunkmain
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Time required for curing of wall tiles before fixing
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
What is the coeffiencent Friction Angle between Steel and Ashphalt?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
Define graphics window?
rate analysis hiring of generator 62.5 KVA
what is the formula for Mass of cement grout (Dg)=???
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force