Answer Posted / adil abbasi
In structural engineering, a pre-engineered building (PEB) is designed by a PEB supplier or PEB manufacturer, to be fabricated using best suited inventory of raw materials available from all sources and manufacturing methods that can efficiently satisfy a wide range of structural and aesthetic design requirements.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
How to find beam R/F cutting length
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
plz.show development and anchorage length in simple diagram.
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
Critical Path Method is...
What are advancements in civil engineering?
What is the use of water table & Kreb stone for drain
What is unit weight of normal concrete?