How can calculate the number of bricks.....? Give me answer hurry uppppppppp
Answer Posted / sharique fattah
joint thickness(10mm) between the side MUST also be considered
go to following link for a clear idea..
(Why so many bricks ??? | Construction basics re-told
https://constructionqueries.wordpress.com/2014/12/04/why-so-many-bricks/)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
satart to end steps by step process of building construction...? i want to planning theme accuretly
Which prize is the alternative to the NOVEL Prize?
Prepare a Schedule for a Highrised building from starting stage to Handover?
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
During reclamation how can the occurrence of mud waves can be rectified?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
what is mc arther pile?
types of piles detail,
in plate load test what is the thickness of plate 20mm 5mm 50mm none
what is the ingredient value of 40mm and 20mm aggregates?
"Gates of the dams are generally designed of curved shape". Why?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What are the advantages and disadvantages of using plastic and timber fenders?
what is diffrence between catchment area,watershed and basin?