What is the standard unit of bricks???
How much steel and concrit required in 1000 square feet slab?
I dont know english very well to speak,in interview if they ask to introduce yourself means how to answer in english?
what is mean by super structure?
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
what are the major benefit in auto level?
Whats the meanig of ,'K' VALUE in the case of soil.....
how do you measure the 1:2:4 and 1:1:2 proportion rcc concrete for one cubic metre? what is the cement qty. sand qty. jelly qty.
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
what affect on the structure and related beam of slab when provide one way slab insteade of two way slab
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)