What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.

Answer Posted / nadim shaikh

6% to 10%
also depends upon stacking of materials

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

1888


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

1468


What is made from large rocks, which protects the base of cliffs?

748


how to conversation of all construction material in to brass

4714


How to do rate analysis for concrete work including shuttering work?

1562






I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2320


how to calculate rate analysys of 1:6 plastering 10 sq m

2509


Define What does civil status mean?

759


Explain the difference between slab and beam?

669


The foundations are placed below ground level, to increase?

792


What is meant by a context menu in a cad software?

688


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2391


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

1893


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1384


important question on stones

1525