What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
Answer Posted / nadim shaikh
6% to 10%
also depends upon stacking of materials
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
how to find ssm in foundation?
What is the outturn of Ceiling plastering
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
How to calculate the force on a column of three story building. What should be the base concrete height?.
what is directivity effect?
Write short note on construction programme for pile foundation.
what do you understand by M25 concrete
how many digree of freedom in four bar chain
what are the types of design? which type of method is used at what type of design & why?
Specific gravity of cement?
Differentiate first angle & third angle projection?
What is a projection line?
what is the water-cement ratio of mix design while 30mpa in 7 days?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete