What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
Answer Posted / nadim shaikh
6% to 10%
also depends upon stacking of materials
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What is meant by dimensioning?
What is the Null Point of chimney in Power Plant
what is pile and deam foundation
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
how to determine H- zone in a column? where it will occur?
How do You Maintain a structure after getting cube test of low strength.
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
pls give me some basic informations in construction of a structure?
How many kilo-newtons equals 1000 kilogram?
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
What is the sugested procedure of water purification for public supply?
what's the formula for calculate pcc for matt(45mm aggregate)?