What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
Answer Posted / nadim shaikh
6% to 10%
also depends upon stacking of materials
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What is made from large rocks, which protects the base of cliffs?
how to conversation of all construction material in to brass
How to do rate analysis for concrete work including shuttering work?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
how to calculate rate analysys of 1:6 plastering 10 sq m
Define What does civil status mean?
Explain the difference between slab and beam?
The foundations are placed below ground level, to increase?
What is meant by a context menu in a cad software?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
important question on stones