In cement concrete how to check a quality of material also proportion of material at site ?
No Answer is Posted For this Question
Be the First to Post Answer
You have casted a column above your footing, and you found out it is off its location by 5cm. What would you Do?
What in bending moment, if a moment is free end of cantilever beam?
shuttering consumption per square feet in multi storeyed building?
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
definition of compressive strength. definition of compressive stress.
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what do you calaculate PCC/GRADE 10
How many layers in 12mm and 18mm plywood?
Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
how can i calculate cement in brickwork
Did you handle any interior designing jobs?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)