In cement concrete how to check a quality of material also proportion of material at site ?
No Answer is Posted For this Question
Be the First to Post Answer
1:4:8 pcc calculation 591 cu.ft
what is the IS code no. for concrete wastage?
what do you mean by ssd how it calculated
What is meaning of FREE STANDING STAIRCASE ?
25. Are you willing to work overtime?
HOw much % of premium on DSR-2013 currently
What is oneside mat. And explain
how to cal 1:4 in brick masonary work cement and sand?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
10 sqr in room reinforce concret so athu evvalavu wait thankum , atha eppati calculate panrathu
How do you to separate Marble and Granite. What are difference between them?
What do you mean by the word 'shear'?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)