Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is "L" provided at the base of column??



What is "L" provided at the base of column??..

Answer / m hari

L is provided in column for standing well.
If we provide only sraight then it is not well bonded. & Fall down.
So binding to the base the short span of L, it is provided.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

0 Answers  


Plz tell me...column and wall section drawing.

1 Answers  


how to convert kg/m3 to kg/cft

6 Answers   L&T,


what is Brick crushing strength(PSI)?

0 Answers  


What should be the Slump(Min.)in cement in concrete in all grades of concrete?

2 Answers  


The largest size of paper used in plotter to print the drawing made by Autocad .

0 Answers  


What is factor not to be taken in consideration in mix design?

0 Answers   MMUP,


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

0 Answers  


how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.

16 Answers   ARS, College School Exams Tests, Gulf Construction, HRL, mWorkspace, NCC, URC Construction,


what is that one cub metre plaster in cemant and fine sand

0 Answers   IVRCL, Kanti Thermal Power Station, Unity Infraprojects,


RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.

2 Answers   ABS Construction, L&T,


What is the actual consumption of bindingwire Per MT for multi-storied housing construction

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)