What is "L" provided at the base of column??
Answer / m hari
L is provided in column for standing well.
If we provide only sraight then it is not well bonded. & Fall down.
So binding to the base the short span of L, it is provided.
Is This Answer Correct ? | 0 Yes | 0 No |
What is the diff between cad & cadd?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
what is conrete grade ,how are depent on concrete grad and size of concrete?
how to design and calculate materail quantity for concrete speedbreaker ?
Geometric Design Related Code name in India.
bulkege of concrete for design mix concrete for grade m30
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
what are the ffactors you considered choosing the course?
what is the design procedure for building
all engineering filed in which branch mother branch
22 Answers L&T, Manoj Pharma Ltd,
which type of materials should be used for framed structure???
how can we calculate the quantity of cement, sand, aggregate in any concrete mix