What is "L" provided at the base of column??
Answer Posted / m hari
L is provided in column for standing well.
If we provide only sraight then it is not well bonded. & Fall down.
So binding to the base the short span of L, it is provided.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is the most suitable foundation when construct a bird watching tower in a marshy land
Name the main components of a cad gui?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
importance of the soundness test to determine the quality of cement use for any construction
Time required for curing of wall tiles before fixing
five benefits of using standard terminology in the measurement process
how gradation of aggregates effect on slump of fresh concrete?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
pls give me ans to ACT formula cube testing porpuse
how to find hardness of water?why it should be determined?
What is the difference between undo & redo?
in design case of structural member best suitrable percentage of steel limit is what