How do you finishing structure....any one structure ....
No Answer is Posted For this Question
Be the First to Post Answer
What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
which is greater moment at centre or fixed end moment for a fixed beam with udl
what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.
what is the difference in density of fresh concrete and hardened concrete?
1 Answers GPSC Gujarat Public Service Commission,
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
levelling least count
how many bags of cement required in neat cement finish per square metre
rate analysis for shuttering 1:6
how to convert cement, sand aggregate quantity from M3 to kg with full description?
If 600mm*200mm*150** size bricks comes 55 piece in one cubic meter then how many 230mm*115mm*75 bricks in one cubic meter
rate analysis for cement pointing 1:4 , for 100 sq m
What was your synopsis for thesis topic?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)