what is Pre- commissioning.
Answers were Sorted based on User's Feedback
Answer / mahesh
Before start up a plant need to cheek instrument range, connection, parameter, soars. different cheeking only help of p&id.
| Is This Answer Correct ? | 2 Yes | 0 No |
In addition to above ans w. r.t an instrument...
w.r.t to a system consists of PLC panel
Earthing should be done properly and proper earth resistance value...
Electronic earthing and body earthing..
UPS supply availability, all the cables.,
PLC-MCC
PLC- field
ensuring laid,terminated and loop checked okay...
PLC- SCADA PCs all Ethernet cables laid and terminated as per system architecture...
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / faiyaz
before start up the plant we check all the instrument and parameter with the water in process line that is called pre commissioning
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / faiyaz
pre commissioning is the process of providing the ability of a pipe line and piping system to contain product without leaking
| Is This Answer Correct ? | 0 Yes | 0 No |
What Is Pre- Commissioning Package +what is DCS & ESD Pre- Commissioning for Instruments Please explain your answer on practical ground base
Can a pneumatic control valve work without positioner?
explane hart protocol? what is its advantages.
we want to control pump in let pressure and tank (for exp) our inlet line if water cam and pump will on and when our tank will full pump will off also if our inlet pressure low pump will off even tank not full.this pump i want to uses on our water supply line.
What is scan time of PLC?
please send the sample qustion paper for iocl written test ..
How RAL(Rotary air lock)works in cement industry?
how can i check vortex shedder bar it is ok? if there is ohms condition are shown correct?
CONTROL VALVE OPERATING IN MANUAL BUT NOT IN MANUAL. WHAT SHOULD BE THE PROBLEM ?
generally transmitter power supply having some range(12v to 35v) but the out put(4-20 mA) must same for given input.If we vary the power supply voltage then output mA also to be change according to V=IR. Is there any voltage regulator in the transmitter ?
Explain level troll principle & interface level measurement.
what are the installation requirement is common to all flow meter when volumetric flow rate is being measured
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)