how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3
example= i have 8.15 m2 how to estimate quantity

Answers were Sorted based on User's Feedback



how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 e..

Answer / sreejith

I will give the basic for calculating the plastering quantity for 100 m2.You can use the same way based on your required mortar volume

Let Area to be plastered=100 m^2
& Thickness of plaster= 12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+5=6
For 12mm plastering in 1:5 cement:sand mortar mix,

1)Cement required= 1.92/6= 0.32 cu. m
No. of bags of cement= 0.320/0.0347=9.22 bags
>>9 bags(say)
Kgs of cement required=9 x 50= 450 kg (approx)

2)Sand required= [1.92 x (5/6)]= 1.60 cu. m


[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347

Is This Answer Correct ?    5 Yes 0 No

how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 e..

Answer / ajay patel

first find perimeter of cylinder that is (3.14 * D)
then multiplied by height of cylinder
do same for both side
you will ger ans in square meter

Is This Answer Correct ?    4 Yes 1 No

how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 e..

Answer / hanamareddy maddur

01) volume of plaster=area of plaster*thickness of plaster=8.15*.012=.0978 m2
02) 20 % extra for joint filling &wastage=.0978*.2+.0978=.117m2
03) 1/3rd volume increase to get the dry volume=1/3*.117+.117=.156m2
04) sum of proportion-1:3(1+3)=4
05) cement qty=cement proportion*volume of mortar /sum of proportion
06) cement qty=1/4*.156=.039*28.2=1.1 bag
07) sand qty=sand proportion*volume of mortar/sum of proportion
08) sand qty=3/4*.156=.12m3

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What do you understand by “preset” during the installation process of bridge bearings?

0 Answers  


what is the ration of the dummy columns which are to be dismantled in reconstruction for laying original columns

1 Answers  


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

0 Answers  


Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

0 Answers   Nespak,


what is civil engineer greatest strength and weakness?

0 Answers   Cube, NCC,






What is the material consumption- cement,sand,tiles etc for Toilet dado?

0 Answers  


what is meant by shear wall?

2 Answers  


Basic civil interview questions 

0 Answers   IOCL, SSC,


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

0 Answers  


what is the cement mortor thickness for 23 cm brick work and 11.5 brickwork?

5 Answers   Punj Lloyd Ltd,


what does the track parameter mean in staad.pro?

0 Answers  


What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)