What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
No Answer is Posted For this Question
Be the First to Post Answer
Cube tests of concrete are failed at 7 days and 28 days.What is your next action?
How many square meter can mason layout chb per hour
why main steel is to be reinforced in shorter direction in case of slab?
how to calculate rate analysis for shuttering of waffle slab
what is injection grouting and what is rewiring.
Why did you choose this career?
which is cover of r.c.c. column,beam and slab
Typical floor design load in Residential Building----------- -----
Which brick is best for construction ,either fly ash or AAC BLOCKS
Is 456 revised lastly in which year? & What are the revisions?
why steel is used in rcc columns? what is its purpose?
what type offoundation suitable for clayey type soil
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)