What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
No Answer is Posted For this Question
Be the First to Post Answer
what are the different types of sizes of bricks?
Tell me about triple point of water.
How to take steel quantity for beams ?how to calculate stirrups
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How do you determine or evaluate success?
What is the meaning of TMT on Steel rebars
How is rate analysis prepared for M 25 grade of concrete?
what is the length of a steel bar when it buy for the site????
17. What is the thing that can disappoint you while working for a certain employer?
how much quantity of paint is required for 1 square meter wall for single and double coat..?
Please tell me about surveying standard chain details.Thanks.
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)