What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
No Answer is Posted For this Question
Be the First to Post Answer
how much quantity of cement bags are required to fill the one m3 of empty container.?
12 Answers L&T, NBDL, SEW Infrastructure,
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
what is the allowable silt content in concrete?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Is density and unit weight are same, if not why both r having same unit, wats the difference between them.
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
What is the outturn of Ceiling plastering
why did you choose this career
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
how will calculate the lift load in high rise buildings
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
What are the different approaches in designing the floors of the service reservoirs?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)