For a RCC section with congested reinforcement , what is the compaction factor
Answer Posted / parul
google search.....
.95 to .96
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How to find permissible diagonal tensile stress in reinforced brick work
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
What is meant by scaffolding coefficient?
What is zoning permit?
What happens to Load at yielding ?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
which red: used in roof teping, then use only cement
Calculation of Pier Cap with tapper area?
crank types
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
how can we construct building without foundation providing only grade beam at ground level
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How to construct a water sump in a rocky soil?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS