Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why lightning arrester blast in rainy day?



Why lightning arrester blast in rainy day?..

Answer / n.bharat mohan

the main purpose of using lighting arrester is to suppress the high voltage caused due to lighting.during rainy day the effect of rain on the lighting arrestor will decrease its insulation value, which results in a heavy current to flow from the arrester, which raise to blast the arrester.

Is This Answer Correct ?    15 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

wht do u mean by constant flux linkage theorem ?

3 Answers  


What is the meaning of Dyn11 of Transformer.

17 Answers  


I have a CT meter with ratio 60/5. The meter reading of previous month was 3290.49 and that of current month was 3797.26. How many chargeable units as per normal meter should be my reading.

0 Answers  


The potential difference between a phase and neutral is 230v , but the potential difference between two phases is 400v. why?

4 Answers   HCL,


What is a feedback in control system?

0 Answers  


what is residuel magnetism. and how order lead acid batteries for 24 volt. emergency lighting system.

0 Answers  


Basic motor transformer generator

0 Answers   eCentric Solutions,


what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.

0 Answers  


CTs Ratio

2 Answers  


voltage at generation stage is usually- ? a.11kv b.33kv c.66kv d.220kv

12 Answers  


We order Dyn 5 distribution transformer to a company. What arrives is Dyn 11. Is it ok to use this transformer. It will be installed alone.

3 Answers   G&S Construction,


Why OLTC(On Load Tap Changing)transformer is not recomended for improving voltage instability?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)