my project load is 6 MW so please suggest the size of cable.. ALU 3c 400 aqmm cable can be sufficient.. is there any thumb rule for calculation of cable size please help me



my project load is 6 MW so please suggest the size of cable.. ALU 3c 400 aqmm cable can be sufficien..

Answer / nagesh.patwari

Yes there's a thumb rule for cable size calculation for 1sqmm Aluminum cable can carry 2Amps and 1 Sqmm Copper wire can carry 4 Amps.

However the cable size increase above 100 Sqmm this thumb rule can not be considered. You need to refer the cable size calculation chart.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how is the testing of an REF relay? what are the test REF circuit having?

0 Answers   Siemens,


why synchronous motor is not self starting

5 Answers   Cenored,


One of the advantages of HRC fuse links is that they can be used to back up equipment with an inadequate rupture rating. briefly discuss what this means

1 Answers  


How can we measure earthing resistance test (Earth meggar) of Transformer neutral pit while in live condition?.

0 Answers  


what is differential relay in power transformer??

8 Answers  






how to generator maintenance (A Check, B check,Etc)

0 Answers   Cummins, HCL,


why do we connect voltmeter in parallel,why not in series,and why do we connect ammeter in series why not in paprallel...

4 Answers  


for 750 kw LT load what will be the ht kva

0 Answers   Sterling Tools,


why all selected supply voltages are multiple of 11.i.e440,11 kv,33 kv,66 kv,110 kv etc

6 Answers   Suzlon, TCS,


In a 11Kv/433Volt Delt-star step down transformer one one line(Line-B) of HT site is open & earthed on DP structur. What will be the voltage on LT side R-Y, Y-B,B-R and R-N, Y- N & B-N?. Please help to understand the problem with examples. Arvind , Jaipur.

1 Answers  


what is the relation between size of the anteena and wavelenghth of radiated wave

0 Answers  


dear all, How do i increase UPS (1000VA)backup time ? i have connected 2 12v wold you please 120 aH battery externally. ups charge the lead acid battery only 12.7 volt. backup time only 10.00 minuts and gose off. can any one of you help me?

1 Answers   Technomax, ups,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)