Answer Posted / shadavali123@gmail.com
H/3(A1+A2+underwrote 4AM) where is the h is the height of tepar of footing A1 is the area of column size area and A2 is the fotting is the base area AM is the mid point .so end
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is Density of cement, sand & aggregate ?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Exterior Joints,define
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is horizon or horizontal mining?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
what are the types of design? which type of method is used at what type of design & why?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
what is smart building materials?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
What are your goals?
difference between fc and fc'?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?