Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


when power factor leading above 1 than defect moter and kwh.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Engineering Interview Questions

Basic questions asked in HPCL(instrumentation) in refinery section

1 Answers   HPCL,


What is the neutral voltage in practical AC systems

0 Answers   VCMS Technologies,


Question 95 - The following formula is used as a reference : (analyte signal) / (internal standard signal) = (f-factor) x (concentration of analyte) / (concentration of internal standard). A solution containing 3 mM of analyte and 4 mM of internal standard gave peak signals of 2 and 3 mamps respectively. Another similar solution containing 2 mM of analyte and 1 mM of internal standard gave peak signals of 1 and 4 mamps respectively. Find the average f-factor.

1 Answers  


Methodology for calibration for ctm.... Explain in simple way pls

0 Answers  


Why we make body earthing of transformer and what will be the size of the copper wire for this purpose related to KVA Capacity of the Transformer as per code.

0 Answers  


i want to design tap changer for 15kv to 0.4kv steepdown transformer then how can i calculate tap number required

0 Answers  


how we can calculate the load appeared on programable logic controller.and what is the method to calculate the scan time of PLC.

0 Answers   Siemens,


i want MEIL placementt papers

0 Answers   MEIL,


In an existing power plant (phase I) with step up transformers (3nos) with Ynd1 vector group to the 400KV bus bar,an extension power plant (phase II) with transformers (4nos) with Ynd11 vector group >. what are the consequences of such configuration ,please note that % impedance are also differ i.e. 15% & 10.5% the reason was that auxiliary supply interface is at different voltage levels i.e 400v & 6.6KV in phase i and phase II respectively .please advise ! Thank you !

1 Answers  


what is the work of commutator and brush in motor

0 Answers  


why we use transformers?

0 Answers  


difference between gauges and comparator

0 Answers  


Categories