How we decide the type of footing?
you can select the footing type according to the soil type, shear strength, bearing capacity of soil and the distance of the hard strata below the soil, soil profile and bearing capacity difference in various points of the plot.
Is This Answer Correct ? | 1 Yes | 0 No |
how to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft.
What is the proportion of cement agg. and sand for M20,M25 and M30?
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
how to caluclate sienerge qty in construction in ap
0 Answers Rites, VR Residency,
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
calculation of cement bags in 1:2:4 concrete mix
sir how can we find the cement and sand required for making 4" drop
if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??
How can i do RCC rate analysis?
What is the largest concrete dam in the world?
what is mcArther pile?
1 Answers Kerala Public Service Commission,