Answer / m dawood
The morter for brick is (25-28)% volume of total volume of the brick structure
After finding volume of morter we can find the quantity of cement from the ratio of morter mix
| Is This Answer Correct ? | 4 Yes | 0 No |
What does civil status mean?
as we take 30% of whole brick work masonry ,so how much % we take in block masonry?
How can we cross check the excavation and backfilling quantities.
different types of rcc slab
What is the difference between vitrified and ceramic tiles?
How to fix toll charge for a particular vehicle at toll booths in a highway?
How much steel required in 900 square feet slab?
17 Answers RCC, Sai Steel Corporation, TATA,
How much binding wire is required for one tone reinforcement ?
21 Answers ARS, Gammon, L&T, Lodha, Pratibha Industries,
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
What is the proportion of M 45 grade of concrete
what is chicken mesh?explain its use
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)