How can calculate cement quantity in brick work
Answers were Sorted based on User's Feedback
Answer / m dawood
The morter for brick is (25-28)% volume of total volume of the brick structure
After finding volume of morter we can find the quantity of cement from the ratio of morter mix
| Is This Answer Correct ? | 4 Yes | 0 No |
what is meant by VDF FLOORING? why it is used?
What is code for designing a sheet pile?
How to find out kg per Sft ?
how much to get of BRC lapping in full yield and half yield ?
Which IS Code describe the industrial flooring?
What is gravity flow?
Why the finite element method is lower bound solution?
What are the Types Of DPC and its Thickness used?
7500 liters capacity of water tank find the inner Length L = ? Breadth B = ? Depth D = ? in feet
can u use instead of water milk for concreting
Why the height of the bridges over the river are very low?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)