sir plz provide FACTSET written test (finance)based papers with answers
Answer / ganesh
plz provide me written test based papers with answers..
| Is This Answer Correct ? | 111 Yes | 13 No |
1@2=8,3@5=323,4@5=?
why do we select u and what value added services that u will add to our company?
3 Answers Automation, Ranbaxy,
16) There are two water tanks A and B, A is much smaller than B. While water fills at the rate of one litre every hour in A, it gets filled up like 10, 20, 40, 80, 160... in tank B. (At the end of first hour, B has 10 litres , second hour it has 20, and so on). If tank B is 1/32 filled after 21 hours, what is the total duration required to fill it completely? a) 26 hrs b) 25 hrs c) 5 hrs d) 27 hrs
6 Answers CTS, iSoft, TCS, Wipro, Yahoo,
any body who got interview call letter from axis bank... ganesh here... call me 9842648112 or mail me at ganesh_280574@rediffmail.com
judys plans to visit the national gallery once in each month in 2001 except in july and august when she plans to go three times each. a single admission cost $3.5,a pass valid for unlimited visits in any 3 mnth period can be purchasedfor $18,and in annual pass costs $60.what is the least amount in dollars that judy can spend for her intended numbers of visits
4 Answers Financial Technologies,
A Father Has 7 Pennys With Him And 1 Water Melon Is For 1p, 2chickoos For 1p, 3 Grapes Foe 1p. He Has Three Sons. How Can He Share The Fruits Equally?
There are 6 consecutive numbers P, Q, R, S, T, U, not necessarily in that order. Given that, Q is 2 less that P, P is 3 less that T and R is 2 less than S, arrange them in an ascending order.
In the rectangle LMNO, the perpendicular bisector of LN divides the longer side LM in a ratio 2: 1. Then the angle between LN and MO is
Age of Grandfather is the ages of 4 grandchildren where their ages are in consecutive.Find the age of Grandfather.
Financial aptitude
6*12*15 is the volume of some material. How many cubes of edge 3 can be inserted into it?
If it takes 10 technicians working 6 hours to build a server. They start woring at 11 AM and 1 technician is added per hour starting at 5 PM. At what time they will finish the server?