A monkey climbs a 52 – m smooth pole. It climbs 6 m up in one
minute and slips
2 m down in every alternate minute. How long will it take to
reach the top of the pole?
Answers were Sorted based on User's Feedback
Answer / sandeep.r
24 minutes and 40 seconds.
A monkey will climb a distance of 4m in every 2 minutes
(lets call it 1 cycle of climbing 6m and slipping 2m)
so it will take a total of 12 such cycles for it reach 48m
i.e. 24 minutes.
now it has to cover another 4 meters to reach the top.
So
it covers 6m in 1 minute i.e 6m in 60 sec.
so it covers 1 m in 60/6 sec i.e 10 sec.
so it covers 4 m in 10*4=40 sec.
So in total it takes 24 minutes and 40 seconds.
| Is This Answer Correct ? | 31 Yes | 9 No |
Answer / bhavya
IN 1st min it climbs-6m, and in 2nd min it slips-2ms
i.e = 1 min- 6m =6m
2 min- (6m-2m)=4m
.'. in every 2min it can climb= 10m (6m+4m)
3 min- 6m (10m+6m) =16m
4 min- 4m (16m+4m) =20m
5 min- 6m (20m+6m) =26m
6 min- 4m (26m+4m) =30m
7 min- 6m (30m+6m) =36m
8 min- 4m (36m+4m) =40m
9 min- 6m (40m+6m) =46m
10 min- 6m (46m+6m) =52m
and in last min there is no chance to slip
So the ans is = 10min
| Is This Answer Correct ? | 13 Yes | 18 No |
Answer / vinit.p.c
Reading the question carefully...
Monkey climbs 6m/min...it slips by 2m evey alternate min
which means it climbs 6m and slips by 2m...
So,
1st min->6m
2nd min->((6+6)-2)=10
So,for 5*(2 min) i.e for 10 min it would have climbed 50
m...(Considering it slips by 2 m in 10th min)
Here, in the 10 min if it climbs 6 m and doesnot slip, the
answer is 10 min. If it slips, then for 2 m i.e 50m to 52
m, it would be (2/6)*60=20 seconds.
So, answer would be 10 min,20 seconds.
| Is This Answer Correct ? | 3 Yes | 8 No |
Answer / deepesh
IN 1st min it climbs-6m, and in 2nd min it slips-2ms
bcoz it slip in alternate minute 2 m not i min so it clim in
one min 6 min and again 2min it climb 6min then total 12 m
and 2m slip then overall it climb in 2 min =12m-2m =10m
i.e = 1 min- 6m =6m
2 min- (6m-2m)=4m
.'. in every 2min it can climb= 10m (6m+4m)
3 min- 6m (10m+6m) =16m
4 min- 4m (16m+4m) =20m
5 min- 6m (20m+6m) =26m
6 min- 4m (26m+4m) =30m
7 min- 6m (30m+6m) =36m
8 min- 4m (36m+4m) =40m
9 min- 6m (40m+6m) =46m
10 min- 6m (46m+6m) =52m
and in last min there is no chance to slip
So the ans is = 10min
| Is This Answer Correct ? | 1 Yes | 6 No |
Answer / sreejith
10minute...
2min for 10mtr...9min for 46metr so in 10min mnkey reach at
52mtr..he slip down only aftr reaching at the top....
| Is This Answer Correct ? | 0 Yes | 5 No |
Answer / frankkapoor
sorry to say but all are dumb let me go by actuall methode
in first min it climbs 6 and second min it slips 2
so in 1 min - 6
in 2 min - (6-2) = 4
in 3 min - (4+6) = 10
in 4 min - (10-2) = 8
and this process will go on and the actual answer is
25 min
| Is This Answer Correct ? | 2 Yes | 7 No |
Answer / amit
it take 2 minutes to reach 4 mite
so 2/4 *52=26 minute
so to climb he will take 52 meters he will take =26 minute
| Is This Answer Correct ? | 4 Yes | 9 No |
Answer / john
in two minute he goes 6-2=4
in 30 min he reaches 60 as 4 times 15 is equal to 60
so 56=28
52=26
ans is 26
| Is This Answer Correct ? | 3 Yes | 8 No |
the ticket sales s for a company increases 25% from standard sales to 60 tickets sold, then 60 - s =:
(103.7 x 101.3)2 = 10? (a) 6 (b) 7 (c) 10 (d) 3 (e) None of these
The sum of the digits of a two digit number is 8.When 18 is added to the number, the digits are reversed. Find the number?
A THROUGH HOLE OF 6" LENGTH IS DRILLED THROUGH THE CENTRE OF A SPHERE.WHAT WILL BE THE REMAINING VOLUME OF THE SPHERE? ONLY ONE DATA IS GIVEN AND THERE IS NO INFORMATION MISSING.
Sum of slopes of 2 perpendicular st. lines is given. Find the pair of lines from the given set of options which satisfy the above condition?
A and B decide to speak truth or lie on a day. Another person asks A if he is saying truth or lie. B listens to A whatever he answers. Now the person asks B what A had told. B replies as " A has told that he is a liar". What does B say?
A hotel has 10 storeys. Which floor is above the floor below the floor, below the floor above the floor, below the floor above the fifth.
The major component of CNG is a. Ethane b. Propane c. Butane d. Methane
Find the missing word(...),ayw,gec,mki,sqo
what is the exact time between 4 and 5 o'clock, when both the hands are exactly opposite to each other? need answer.
During a given week A programer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
13 Answers L&T, TCS,
A,B,C,D,E are some numbers.if AB * CD = EEE and CD - A =CC THEN what is AB * D =? IN SAME CODE .